History

  1. 50th anniversary of NIS

    2019
    2019

  2. Consulting and delivery of tools for thermal disassembly of the reactor pressure vessel of the nuclear power plant Mühlheim-Kärlich

    2019

  3. Plant design for the optimization of the conditioning plant within the NEUKON project at Würenlingen (ZWILAG), Switzerland

    2019

  4. Development of the climate database

    2018

  5. Delivery of technical support and special tools for mechanical disassembly of core internals and thermal cutting of reactor pressure vessels for both units of SONGS NPP (USA, California). Complete dismantling is performed remotely due to radiological boundary conditions.

    2017
    2017

  6. Extension of our portfolio to include state-of-the-art tensioning technology through the Tensioning System division

    2017
    2017

  7. Development of the information system BIS-BoKat

    2012
    2012

  8. Planning and execution of primary circuit decontamination in the Biblis nuclear power plant with ASDOC-D_MOD

    2012
    2012

  9. New equipment NIS technical center around underwater test stand, combustion chamber, electrical workshop, mechanical workshop, radiation measuring equipment, training rooms, material storage, crane with slinging equipment, winches, hoists, pumps, etc.

    2011
    2011

  10. Supply of tools and technical support for dismantling of core internals and reactor pressure vessels, by remotely controlled flame cutting technology in double unit plant of Zion NPP, Illinois, USA

    2011
    2011

  11. NIS handles the dismantling, disassembly, packaging and disposal or interim storage of the reactor pressure vessel at the Stade NPP.

    2008
    2008

  12. Development of the BLAde VIbration Monitoring Method, for the acquisition, evaluation and monitoring of blade vibrations in turbines.

    2005
    2005

  13. Support for the decommissioning of the Würgassen NPP by supplying an underwater sawing unit

    2004
    2004

  14. Development of the radioactive components tracking program RVP.

    2004
    2004

  15. Expansion of NIS through Essen location, acquisition of further successful projects, including vibration diagnostics

    2001
    2001

  16. Start of replacement of process computer systems at the Gundremmingen NPP

    2000
    2000

  17. Fuel element, information and reporting system BABS goes live

    1999
    1999

  18. Development of the personal dosimetry system PADE KKW Brokdorf begins

    1999
    1999

  19. NIS starts with the first CASTOR loading documentation

    1997

  20. Control rod drive computer for reactor control

    1997
    1997

  21. Contract for the development of the facility management system BAGS

    1996
    1996

  22. Commissioning of the KSIM core simulator

    1993
    1993

  23. Start of TWIST pilot project for drinking water monitoring and documentation

    1993
    1993

  24. Conzept for NIS-PAR - „Passive Autocatalytic Recombiner“

    1989
    1989

  25. Delivery of the underwater plasma cutting system, disassembly and dismantling of moderator tank, tank internals and thermal shield of the Karlsruhe multipurpose research reactor.

    1989
    1989

  26. Development and delivery of the first permanently mounted outdoor measurement system for low-level radioactive residues (with NIS patent)

    1988
    1988

  27. Development of a measuring device for the inspection of very low-level radioactive plant components - the surface monitoring system

    1985
    1985

  28. Development of emission data acquisition system EDAS - predecessor of today's Environmental Office/TALASssionsdatenerfassungssystem EDAS – Vorgänger vom heutigen Umweltoffice/TALAS

    1983
    1983

  29. Research project on the melting of radioactive scrap metal

    1983
    1983

  30. Development of the first decommissioning cost program (STILLKO) for D and EU

    1981
    1981

  31. Study on reuse possibilities of reprocessed uranium (WAU)/plutonium.

    1980

  32. Start of fuel element deployment planning

    1978
    1978

  33. Licensing procedure, radiation protection, residue management as well as documentation for the complete dismantling and removal of the Niederaichbach NPP with NOELL GmbH

    1976/1977

  34. Proofs of decommissionability and creation of a cost model (STILLKO) for light water reactors.

    1976/1977
    1976/1977

  35. Analyses of safety and effects of previous incidents during decommissioning

    1975
    1975

  36. Calculation of decommissioning costs of power reactors and experimental plants

    1972/1973
    1972/1973

  37. Foundation of NIS - Nuklear-Ingenieur-Service GmbH

    1969